Refine your search
Collections
Co-Authors
A B C D E F G H I J K L M N O P Q R S T U V W X Y Z All
Mandal, S. K.
- Selection of Suitable Physico-Chemical Conditions for Gluconic Acid Production by a Mutant Aureobasidium Pullulans SG 80
Abstract Views :277 |
PDF Views:2
Authors
Affiliations
1 Department of Biological Sciences, Sankrail Abhoy Charan High School (H.S.), Sankrail, Howrah, West Bengal, IN
2 Department of Organon of Medicine, Midnapore Homeopathic Medical College and Hospital, Midnapore (W), West Bengal, IN
3 Department of Physiology, Surendranath College, Kolkata, West Bengal, IN
1 Department of Biological Sciences, Sankrail Abhoy Charan High School (H.S.), Sankrail, Howrah, West Bengal, IN
2 Department of Organon of Medicine, Midnapore Homeopathic Medical College and Hospital, Midnapore (W), West Bengal, IN
3 Department of Physiology, Surendranath College, Kolkata, West Bengal, IN
Source
Asian Journal of Research in Chemistry, Vol 6, No 1 (2013), Pagination: 83-85Abstract
An experimental study was conducted to improve the production of gluconic acid by the mutant Aureobasidium pullulans SG 80 by optimizing different physic-chemical conditions for fermentation. After optimization of different factors, maximum production was obtained with : glucose,8%; (NH4)2SO4,1.0%; K2HPO4,0.15%; CaCO3, 0.25% , MnSO4,,15%; and MgSO4.7H2O,0.25% with maximum utilization of sugar at pH,6.5;volume of medium,30ml; cell density, 5x106 cells/ml; shaker speed ,200 rpm and temperature, 300C.Keywords
Gluconic Acid, Aureobasidium Pullulans, Fermentation, Optimization,utilizationReferences
- Sasaki Y and Takao S, Glutamic acid fermentation by Pullularia Pullulans II,Acid production from various carbon sources. Journal of Pharmentation Technology, 48,1972:368-372.
- Hatcher HJ,Glutamic acid production, United State Patent No 3,669,840(1972).
- Velizarov S and Beschkov V, Biotransformations of glucose to free gluconic acid by Gluconobacter oxydans : substrate and product inhibition situations. Process Biochemistry, 33(5),1998:527-534.
- Znad H, Markos Jand Bales V, Aspergillus niger : growth and non-growth conditions. Process Biochemistry, 39, 2004:1341- 1345.
- Mar Z, GA-103R World Markets for fermentation ingredients (2005).
- Shehata TE and Marr AG, Effect of Nutrient Concentration on growth of Escherichia coli, Journal of Bacteriology, 107(1),1971:210-216.
- Pace ML,Bacterial motility and the fate of bacterial production, Hydrobiologia ,159,1988:41-49.
- Takeoka H and Yoshimura T, The kyucho in uwajima Bay. Journal of Oceanigraphy, 44, 1988:6-16.
- Hoch MP and Bronk DA, Bacterioplankton nutrient metabolism in the eastern tropical North pacific, Journal of Experimental Mar Biology and Ecology, 349, 2007, 390-404.
- Tezuka Y, Bacterial regeneration of ammonium and phosphate as affected by the carbon: nitrogen: phosphorus ratio of organic substances, Microbial Ecology, 19, 1999, 227-238.
- Ichinosuka D et al., Effect of nutrients supplies on growth rates of planktonic bacteria in Uchiumi Bay, Japan. Aquatic Biology, 9, 2010:123-130.
- Lien OG Jr, Determination of Gluconolactone, galactolactolactone and their free acids by hydroxamate method, Annul Chemistry, 31,1959:1363-1366.
- Gusakov AV , Kondratyeva EG and Sinitsyan AP, Comparison of two methods for assaying reducing sugars in the determination of Carbohydrate activities, International Journal of Analytical Chemistry, Article ID 283658,2011:1-4.
- Anastassiadis S and Rehm HJ, Continuous gluconic acid production by Aureobasidium pullulans with and without biomass retention. Electronic Journal of Biotechnology, 9(5), 2006:494-504.
- Overall Equipment Effectiveness of Shovel-Dumper Operation in Opencast Mining–A Review
Abstract Views :171 |
PDF Views:0
Authors
Affiliations
1 CSIR–Central Institute of Mining & Fuel Research, Dhanbad 826001, IN
2 Indian Institute of Technology (ISM), Dhanbad 826004, IN
1 CSIR–Central Institute of Mining & Fuel Research, Dhanbad 826001, IN
2 Indian Institute of Technology (ISM), Dhanbad 826004, IN
Source
Journal of Mines, Metals and Fuels, Vol 68, No 1 (2020), Pagination: 19-24Abstract
One of the principal costs in opencast mine is related to application of loading and haulage equipment. The real challenge of mine management of an opencast mines is to select the proper fleet size of dumpers and shovels and to utilize them effectively; it secures the production needs of a mine as well as minimizes costs of production. Overall equipment effectiveness can be used as a tool to measure the performance and utilization of shovel-dumper operation in opencast mines. Authors of the paper have discussed on the cycle time of shovel and dumper, their dispatching and allocation problem and proper combination in opencast mining operation to optimize the productivity and to reduce the operational cost after reviewing several research artcles.Keywords
Dumper, Shovel, Productivity, Operational Cost, OEE.References
- (1) Akande, M., J., Lawal, A. I. and Aladejare A. E (2013): “Optimization of the overall equipment efficiency (OEE) of loaders and rigid frame trucks in NAMDEB Southern Coastal Mine Stripping fleet, Namibia.” Earth Science, vol.2 no.6 pp: 158-166. , 2013
- (2) Alarie, S. and Gamache, M., (2002): “Overview of solution strategies used in truck dispatching systems for open pit mines”, International Journal of Surface Mining, Reclamation and Environment 16(1) 59–76.
- (3) Basu, A. J., (1999): “Simulation of a large open pit mine operation in Australia”, Mineral resources engineering,8, 157-164.
- (4) Blackwell, G.H., (1999): “Estimatiion of large open pit haulage requirement”, Canadian Institute of Mining, Metallurgy and Petrolium (CIM) Bulletin, Vol. 92 No.1028 Pages 143-148.
- (5) Bonates E. Y.L., (1988): “A computer simulation model to evaluate the effect of dispatching”, International Journal of Surface Mining, Reclamation and Environment,2, 99-104.
- (6) Burt, C. N. (2008): “An Optimization approach to material handling in surface mines”, Ph.D. thesis, Department of Mathematics & Statistics, Curtin University of Technology.
- (7) Celebi, N., (1998): “An equipment selection and cost analysis system for openpit coal mines”, International Journal of Surface Mining, Reclamation and Environment 12 181–187.
- (8) Choi, Y. S. Park, H. D. Sunwoo, C. (2017): “Multi-Criteria Evaluation and Least Cost Path Analysis for Optimal Haulage Routing in Open-Pit Mines”, https:// www.researchgate.net/publication/237622911.
- (9) Douglas, James. (1964): “Prediction of shovel-truck production: A reconciliation of computer and conventional estimates”, Technical reportno. 37, Stanford University, California.
- (10) Elevli, S. and Elevi, B. (2010): “Performance Measurement of Mining Equipments by Utilizing OEE” Acta Montanistica Slovaca, Vol. 15, No 2, pp: 95-101
- (11) Ercelbi, S.G. and Basçetin, A. (2009): “Optimisation of shovel-truck system for opencast mining, J. South African Institute of Mining and Metallurgy.” 109(7): 433-439
- (12) Ercelebi, S. C. Kirmanli. (2000): Proceedings of the Ninth International Symposium on Mine Planning and Equipment Selection /Athens/Greece/6-9 November 2000)
- (13) Forsman, B., Ronnkvist E., Vagenas N., (1993): “Truck dispatching computer simulation in Aitik open pit mine”, International journal of mining, reclamation and environment, 7, 117-120.)
- (14) Gransberg, D.D. (1996): “Optimizing haul unit size and number based on loading facility characteristics.” J.Constr. Eng. Manage., 122(3), 248-253.
- (15) Hanby, I. R., (1991): “Enhancement of dump truck operating efficiency”, Transaction of the Institution of Mining and Metallurgy, Mining Technology, 100: 42-47
- (16) Himebaugh, A. E., (1980): “Computer-Based Truck Dispatching in the Tyrone Mine”, Mining Congress Journal, Vol. 66, No. 11, November, pp. 16-21
- (17) Hodson, D. I., and Barker, K. S. (1985): “The Design and Development of a Computerized Truck Dispatching System”, Mining Conference, Birmingham, UK, pp: 83-90
- (18) Huang, Y. & Kumar, U. (1994): Optimising the number of load-haul-dump machines in a Swedish mine, Pasamehmetoglu,pp. 353 – 358
- (19) Johnson, T. B. (1969): “Optimum production scheduling” in Proceedings of 8th InternationalmSymposium on Computers and Operations Research, pp. 539-562.
- (20) Kesimal, A. (1998): “Shovel-truck productivity and eûciency studies for overburden removal in an open-pit coal mine”, Transactions of the Institution of Mining and Metallurgy, Section A: Mining Industry 107 A37–A40.
- (21) Kirmanli, C. and Ercelebi, S.G. (2009): “An expert system for hydraulic excavator and truck selection in surface mining.” J. S. Afr. Inst. Min. Metall., 109, 727-738.
- (22) Komljenovic, D., Fytas, K. and Paraszczak, J. (2003): “A selection methodology for rear dump mining trucks.” Proc. Of the fourth international conference on computer applications in the minerals industries, Calgary, Alberta, Canada
- (23) Limsiri, C. (2011): “Optimization of loader-hauler fleet selection.” Eur. J. Sci. Res., 56(2), 266-271.
- (24) Li Z., (1989): “A methodology for the optimum control of shovel and truck operations in open pit mining”, Mining Science and Technology, 10, 337-340.
- (25) Lizotte, Y., and Bonates, E., (1987): “Truck and Shovel Dispatching Rules Assessment Using Simulation”, Mining Science and Technology,Vol. 5, pp. 45-58
- (26) Marzouk, M., Moselhi, O., (2002): “Selecting earthmoving equipment ûeets using genetic algorithms”. E. Yucesan, C. Chen, J. Snowdon, J.Charnes, eds., Proceedings of the 2002 Winter Simulation Conference, vol. 2. IEEE Digital, 1789–1796.
- (27) Molotilov, S. G., Cheskidov, V. I., and Norri, V. K., (2008): “Methodical Principles for Planning the Mining and Loading Equipment Capacity for Opencast Mining with the use of Dumpers”, Part I, Journal of Mining Science,Vol. 44, No. 4, 2008, pp 376-385
- (28) Morgan, W. C. & Peterson, L. L. (1968): Determining shovel-truck productivity, Mining Engineeringpp. 76 -80
- (29) Morgan, B. (1994b): Optimizing truck-loader matching: Proceedings of the third International Symposium on Mine Planning and Equipment Selection, Istanbul, Turkey, 18-20 October 1994)
- (30) Mueller, E. R., (1977): “Simplified Dispatching Board Boosts Truck Productivity at Cyprus Pima”, Vol. 29, No. 8, Mining Engineering,pp. 40-43
- (31) Munirathian, M., and Yingling, Jon C., (1994): “A Review of Computer- Based Truck Dispatching Strategies for Surface Mining Operations”, Department of Mining Engineering, University of Kentucky, Lexington, Ky., USA
- (32) Nakajima S. (1998): “Introduction to TPM” Productivity Press, Cambridge, MA
- (33) Newman, A., Enrique, R., Rogrigo C., Andr´es W., Kelly E., (2010): “A review of operations research in mine planning”. Interfaces40(3) 222–245.
- (34) Osanloo, M., Gholamnejad, J., and Karimi, B., (2008): “Long-term open pit mine production planning: A review of models and algorithms”, International Journal of Mining, Reclamation and Environment,22 (1), 3-35.)
- (35) Paraszczak, J. (2005): “Understanding and assessment of mining equipment effectiveness.” Mining Technology,vol.114 no.3, pp:147- 151
- (36) Paterson L. B. and Özdoða, (2001): “Performance of the Bigger, Faster and Smarter New Generation Electric”, 17thInternational Mining Congress and Exhibition of Turkey- 1MCET2001, ©2001, ISBN 975-395-417-4
- (37) Patrick, D.1and Kizil, M. S., (2013): “Improvements in Truck Requirement Estimations using Detailed Haulage Analysis”, Coal Operators’ Conference The University of Wollongong 368, 14-15 February 2013
- (38) Sayadi A. R, Ali Lashgari A, Mohammad Majid Fouladgar, Miroslaw J. Skibniewski, (2012), “Estimating capital and operational costs of backhoe shovels”, Journal of Civil Engineering and Management, Volume 18(3): 378–385
- (39) Schexnayder Cliû, Sandra Weber, Brentwood Brooks, (1999): “Eûect of truck payload weight on production”, Journal of Construction Engineering and Management125(1) 1–7.
- (40) Smith, S. D., Osborne, J. R., Forde, M.C., (1995): “Productivity estimation in back-acter/dump-truck earth-moving operations”, Proceedings of the Institution of Civil Engineers, Transport 111 125–131.
- (41) Smith, S. D., Wood, G. S. & Gould, M. (2000): “A new earthworks estimating methodology’, Construction Management and Economics” 18(2), pp: 219 -228)
- (42) Stahl, P., Donmez, B., Jamieson, G. (2011): “A Field Study of Haul Truck Operations in Open Pit Mines.” Proceeding of the Human Factors and Ergonomics Society, 55th Annual Meeting, pg no. 1845-1849
- (43) Ta, C. H., Ingolfsson, A., and Doucette, J. (2010): Haul truck allocation via queuing theory.
- (44) Tan, Sizhe, Ramani, R. V., (1992): “Optimization models for scheduling ore and waste production in open pit mines”. Y.C. Kim, ed., 23rd application of computers and operations research in the mineral industry.Society for Mining, Metallurgy, and Exploration, Littleton, Colorado, 781-791.
- (45) Tu, H. J., and Hucka, V. J., (1985): “Analysis of Open Pit Truck Haulage System by Use of a Computer Model”, CIM Bulletin, Vol. 78, No. 879, July, pp.63-59
- (46) White, J. W., and Olson, J. P., (1989): “Efficient Optimal Algorithm for Haul Truck Dispatching in Open Pit Mines”, Proceeding of the Intenational Symphosium on Off-Highway Haulage in Surface Mines, Edmonton, Canada, Nay 1989, A. A. Balkema/Rotterdam/ Brookfield, pp. 31- 37
- Whole Body Vibration Exposure and its Effects on Heavy Earthmoving Machinery (HEMM) Operators of Opencast Mines – A Review
Abstract Views :291 |
PDF Views:0
Authors
Affiliations
1 Central Institute of Mining & Fuel Research, Dhanbad, IN
1 Central Institute of Mining & Fuel Research, Dhanbad, IN
Source
Journal of Mines, Metals and Fuels, Vol 68, No 7 (2020), Pagination: 221-228Abstract
Operators of opencast heavy earthmoving machinery (HEMM), during their 8-hour shift duration, are regularly succumbed to the high level of whole body vibration (WBV) amplitudes. Due to long and continuous working in the field, the operators of HEMM may yield to adverse health effects and results in hazardous conditions if the magnitudes repeatedly exceed the permissible limits. Based on extensive literature review, the authors of the paper put forward the recognized harmful adverse health effect of short and longterm WBV exposure of HEMM operators in surface mining and also with the same view with the findings of various researchers in this field and feels that for the safety of operators, long-term understanding of WBV should be carried out instead of short term vibration monitoring.Keywords
Whole Body Vibration (WBV), Heavy Earthmoving Machinery (HEMM), Low Back Pain (LBP), Health Guidance Caution Zone (HGCZ), Root Mean Square (RMS).References
- Cross J, Walters M. (194): Vibration and jarring as a cause of back injury in the NSW coal mining industry. Saf Sci. 17(4):269-74.
- Widanarko B, Legg S, Devereux J, (2015): Stevenson M. Interaction between physical and psychosocial work risk factors for low back symptoms and its consequences amongst Indonesian coal mining workers. Appl Ergon. 46 (Part A):158-67.
- Wilder DG, McLay RW. (2019): Standards in Human Vibration Litigation.Engineering Standards for Forensic Application. Elsevier Inc.; 451-78.
- Donati P. (2002): Survey of technical preventative measures to reduce whole-body vibration effects when designing mobile machinery. Journal of Sound and Vibration, 169-83.
- Pinto I, Stacchini N. (2006): Uncertainty in the evaluation of occupational exposure to whole-body vibration. Journal of Sound and Vibration, 298(3):556–62.
- Hinz B, Seidel H, Menzel G, Blüthner R. (2002): Effects related to random whole-body vibration and posture on a suspended seat with and without backrest. Journal of Sound and Vibration, 265–82.
- Blood RP, Ploger JD, Yost MG, Ching RP, Johnson PW. (2010): Whole body vibration exposures in metropolitan bus drivers: A comparison of three seats. Journal of Sound and Vibration, 329(1):109–20.
- Li H, Schindler C. (2014): Transient dynamics of an excavator tyre rolling over speed bump. Proc Inst Mech Eng Part K J Multi-body Dyn., 228(3):229–40.
- Lewis CA, Johnson PW. (2012); Whole-body vibration exposure in metropolitan bus drivers. Occup Med (Chic Ill), 62(7):519–24.
- Tiemessen IJH, Hulshof CTJ, Frings-Dresen MHW(2007): The development of an intervention programme to reduce whole-body vibration exposure at work induced by a change in behaviour: A study protocol. BMC Public Health,7:1–10.
- Kitazaki S, Griffin MJ. (1997): A modal analysis of whole-body vertical vibration, using a finite element model of the human body. Journal of Sound and Vibration, 200(1):83–103.
- Thalheimer E. (1996): Practical approach to measurement and evaluation of exposure to wholebody vibration in the workplace. Seminars in Perinatology, 77–89.
- Rasmussen G. (1983): Human body vibration exposure and its measurement. The Journal of the Acoustical Society of America, Jun;73(1):1-27.
- Mayton AG, Porter WL, Xu XS, Weston EB, Rubenstein EN. (2006): Investigation of human body vibration exposures on haul trucks operating at U.S. surface mines/quarries relative to haul truck activity. Int J Ind Ergon, 64:188–98.
- Eger T, Salmoni A, Cann A, Jack R. (2006): Whole-body vibration exposure experienced by mining equipment operators. Occupational Ergonomics, Jan 1;6(3, 4):121-7.
- Eger T, Stevenson J, Boileau PÉ, Salmoni A. (2008): Predictions of health risks associated with the operation of load-haul-dump mining vehicles: Part 1 – Analysis of whole-body vibration exposure using ISO 2631-1 and ISO-2631-5 standards. International journal of industrial ergonomics, Sep 1;38(9-10):72638.
- Vanerkar AP, Kulkarni NP, Zade PD, Kamavisdar AS. (2008): Whole body vibration exposure in heavy earth moving machinery operators of metalliferrous mines. Environ Monit Assess, 143(1–3):239–45.
- Bongers PM, Boshuizen HC, HulshoF CTJ, Koemeester AP. (1988): Long-term sickness absence due to back disorders in crane operators exposed to whole-body vibration. Int Arch Occup Environ Health, 61(1–2):59–64.
- Standardization IO. for. Mechanical vibration and shock-Evaluation of human exposure to whole-body vibration-Part 1: General requirements. The Organization 1997.
- Bovenzi M, Franzinelli A, Strambi F. (1988): Prevalence of vibration-induced white finger and assessment of vibration exposure among travertine workers in Italy. Int Arch Occup Environ Health, 61(1–2):25–34.
- Donati P, Schust M, Szopa J, Starck J, Iglesias EG, Senovilla LP, et al. (2008): Workplace exposure to vibration in Europe: an expert review, 1-126 [22] Wolfgang R, Burgess-Limerick R. (2014): Whole-body vibration exposure of haul truck drivers at a surface coal mine. Appl Ergon,45(6):1700–4.
- Kumar S. (2004): Vibration in operating heavy haul trucks in overburden mining. Appl Ergon, 5(6):509–20.
- Chaudhary D.K., Bhattacherjee A, Patra AK, Chau N. (2015): Whole-body vibration exposure of drill operators in iron ore mines and role of machine-related, individual, and rock-related factors. Safety & Health Work, 6(4):268–78.
- Smets MPH, Eger TR, Grenier SG. (2010): Whole-body vibration experienced by haulage truck operators in surface mining operations: A comparison of various analysis methods utilized in the prediction of health risks. Appl Ergon 2010;41(6):763–70.
- Aye SA, Heyns PS. The evaluation of whole-body vibration in a South African opencast mine. J South African Inst Min Metall,111(11):751–7.
- . Blood RP, Rynell PW, Johnson PW. Whole-body vibration in heavy equipment operators of a front-end loader: Role of task exposure and tire configuration with and without traction chains. J Safety Res 2012;43(5–6):357–64.
- Johanning E. (2015): Whole-body vibration-related health disorders in occupational medicine – an international comparison. Ergonomics, 58(7):1239–52.
- Seidel H. (1993): Selected health risks caused by long term, whole body vibration. Am J Ind Med. 23(4): 589-604.
- Seidel H. (2005): On the relationship between wholebody vibration exposure and spinal health risk. Industrial Health, 43:361–77.
- Mandal BB, Srivastava AK. (2010): Musculoskeletal disorders in dumper operators exposed to whole body vibration at indian mines. Int J Mining, Reclam Environ, 24(3):233–43.
- Kim JH, Marin LS, Dennerlein JT. (2018): Evaluation of commercially available seat suspensions to reduce whole body vibration exposures in mining heavy equipment vehicle operators. Appl Ergon,71 (January):78–86.
- Mcphee B, Foster G, Long A. (2009): Essential guide to identify, assess and control vibration risks. 60.
- Ho J, Dennerlein JT, Johnson PW. (2016): The effect of a multi-axis suspension on whole body vibration exposures and physical stress in the neck and low back in agricultural tractor applications. Appl Ergon, 8;68(November, :80–9.
- Coelho PCS, Teixeira JPF, Gonçalves ONBSM. (2011): Mining Activities: Health Impacts. In: Encyclopedia of Environmental Health, 2nd ed. Elsevier Inc:788–802.
- Hinz B, Seidel H, Menzel G, Blüthner R. (2002): Effects related to random whole-body vibration and posture on a suspended seat with and without backrest. In: Journal of Sound and Vibration, 265–82.
- Salmoni AW, Cann AP, Gillin EK, Eger TR. (2008): Case studies in whole-body vibration assessment in the transportation industry-Challenges in the field. Int J Ind Ergon, 38(9–10):783–91.
- Specific blasting technique for tunnelling in hot zones
Abstract Views :172 |
PDF Views:73
Authors
Affiliations
1 CSIR-Central Institute of Mining and Fuel Research, Barwa Road, Dhanbad 826 001, IN
1 CSIR-Central Institute of Mining and Fuel Research, Barwa Road, Dhanbad 826 001, IN
Source
Current Science, Vol 121, No 9 (2021), Pagination: 1227-1234Abstract
Encountering hot zones while excavating tunnels for hydropower projects in the Himalaya, India, is a challenge for civil engineers. Blasting within the hot rock mass can pose serious threats due to possibility of temperature-induced unintended detonation of explosives. Moreover, the paucity of a suitable rock-blasting method for these hot zones sometimes compels engineers to realign the tunnel. Such a realignment is costly and time-consuming. A temperature of 50–98°C was encountered while excavating the rock mass for head race tunnel of Karchham–Wangtoo Hydro-Electric Project, Himachal Pradesh, India. The Directorate General of Mine Safety, India, suggests that blast-holes with temperature greater than 80°C must not be charged and blasted. Similarly, the use of electric or non-electric detonators is discouraged above 70°C because of premature detonation. Hence excavation works were suspended for tunnel construction. A unique drill and blast method has been adopted for blasting the hot strata in the tunnel. The technique described in this study can be easily followed in similar situations for tunnel-rock excavationKeywords
Excavation sequence, geothermal energy, hot zone, quenching, tunnel blastingReferences
- Chandrasekharam, D., Geothermal energy resources of India – past and the present. In Proceedings of World Geothermal Congress, Antalya, Turkey, 2005, pp. 1–9.
- Razdan, P. N., Agarwal, R. K. and Singh, R., Geothermal energy resources and its potential in India. Earth Sci. India, 2013, 7, 14–18.
- Sharma, H. K., Sharma, J. K., Chauhan, R. S. and Kuthiala, S., Challenges in design and construction of HRT of Nathpa Jhakri hydroelectric project (1500 MW) – a case study. In Proceedings of World Tunnel Congress, Agra, 2008.
- Kanjlia, V. K., Focus on India. Tribune, 2008, 32, 5–20.
- Nabiullah, M., Gupta, R. N., Singh, B. and Gangopadhyay, P. K., A study of thermal behaviour of some commercial explosives. Thermochim. Acta, 1988, 134, 419–428.
- Holiday, J. R. and William, M., A blasting plan for loading hot holes. In Proceedings of 22nd Annual Conference on Explosives and Blasting Technique, Society of Explosive Engineers, Orlando, Florida, USA, 1996, vol. 2.
- Nabiullah, M., Pingua, B. M. P., Jagdish and Dhar, B. B., Blasting in hot zone – a case study. In Proceedings of 27th International Conference of Safety in Mines Research Institutes, New Delhi, 1997.
- Skawina, B., Comparison of mechanical excavation and drilling: a discrete event simulation approach. Master’s thesis, Luleå Technical University, Sweden, 2013.
- http://www.oricaminingservices.com/au/en/product/products_and_services/initiating_systems/exel_long_period_detonators/27 (accessed on 23 June 2021).